img

Detail Design for “Construction of New Line between New Modasa (MDSA) at take off point at Km :99.00 (from Nadiad) Chainage Ch.:0.00 m to Shamlaji Road (SJS) at Ch.:26595.40 m (26.595 km) covering all Civil Engineering works (i.e. Earthwork, Blanketing, Side Drains, Retaining Wall, Construction of Important Bridge, all Major / Minor Bridges, RUBs / LHS, Level Crossings, Complete Track works, Ballast Supply and Other Civil Engineering works) of Vadodara Division on Western Railway.

× Zoomed Image




Copyright 2023. All Rights Reserved by Aartav-Engineering.       Design & Developed by VedikIn Solutions