img

Structure Type - RoB

Structure Configuration - 1 x 15+ 1 x 45.40 + 1 x 15 BoW String Span Length 45.40m

Project - GEP8

img

Structure Type - RoB

Structure Configuration - 1x19.3+1x63.400 (sk.)+1x19.3

Open Web Girder - Span Length 63.40m

Project - BDRP

img

Viaduct - 12 nos (Length varies from 420m to 90m)

Project - AP1

Client - H. G. Infra

img

Structure Type - Flyover

Structure Configuration - Span - 1 x 32.20 + 1 x 60.85 PSC Box Girder Span Length 60.9m Deck Width 21.25

Project - VME 12

img

53m Span Steel Foot Over bridge

img

48m Composite Girder

img

47.2m Post Tensioned Pre Stressed I Girder

img

40m Post Tensioned Pre Stressed I Girder

img

30m Pre Stressed Pre Tension Girder

img

Portal Type VUP

img

Major Bridge - 10 Clusters x 4 cells x 11.44m

img
25m Span PSC Integral Type VUP

× Zoomed Image


Copyright 2023. All Rights Reserved by Aartav-Engineering.       Design & Developed by VedikIn Solutions