Detail Design of “Construction of Access-Controlled Six lane (Expandable to Eight lane) Greenfield expressway from Km. 341+700 to Km. 391+900, Design Length of 50.200 Km Package 8 of Ganga Expressway in UttarPradesh”

Client - Patel Infrastructure Ltd

Length - 50.200 Kms

Key Features - 6 Lane with Flexible Pavement, Bow String RoB 1 no, 1 Major Bridge, 4 Flyovers, 10 VUP, 15 LVUP, 10+10 Minor Bridges

img

Detail Design for “Development of 6-Laning with Access Control from Km 29.435 to Km 74.168 of Neelmangala Tumkur including Tumkur Bypass section of NH-48 (old NH-4) in Karnataka on EPC mode ".

Client - H G Infra Engineering Ltd.

Length - 45 Kms

Project Cost - 844 Cr

Key Features - 6 Lane with Flexible Pavement, 3 ROB, 4 Major Bridges, 4 Flyovers, 2 FOB, 5 VOP, 7 VUP, 6 LVUP, 18 Minor Bridges

img

Detail Design for “Four/six Laning of Bodhre (Ex km390.000) to Dhule (Ex km 452.800) section of NH-211 (new NH No. 52); (Design Length 67.231km) in Maharashtra on Hybrid Annuity Mode ".

Client - Kalathia Engineering and Construction Ltd.

Length - 67.23 Kms

Project Cost - 971.12 Cr

Key Features - 4 & 6 Lane with Flexible Pavement, 2 RoBs (Bow String Non Standard Section), 1 RUB, 3 Flyovers, 4 Major Bridge, 3 LVUP, 26 Minor Bridges & 60 Culverts

img

Detail Design for “Development of Six Lane Aluru - Jakkuva Section of NH- 130 - CD Road from km 365+033 to km 396+800 of Raipur - Visakhapatnam Economics Corridor in AP on Hybrid Annuity Mode ".

Client - H G Infra Engineering Ltd.

Length - 31.76 Kms

Project Cost - 1060 Cr

Key Features - 6 Lane with Flexible Pavement, 12 Via-Ducts, 3 Major Bridges, 5 interchange structures, 5 VUP/LVUP, 13 Minor Bridges & 90 Culverts

img

Detail Design for “Construction of Eight lane access controlled Expressway from Km 50.700 to Km 77.000 (Masvan to Ganjad Section of Vadodara Mumbai Expressway) in Maharashtra on Hybrid Annuity mode ".

Client - Montecarlo Ltd.

Length - 26.3 Kms

Project Cost - 1476 Cr

Key Features - 4 Lane Expressway with Flexible Pavement, 2 Flyovers,2 Major Bridge,26 SVUP/LVUP, 3 VUP, 15 Minor Bridges & 59 Culverts

img

Detail Design for “Construction of 8 Lane expressway from junction near Baletiya village to junction with near Pratap Nagar village (design Ch. 351+000 to Ch. 372+500) section of Delhi - Vadodara on EPC Mode".

Client - Patel Infrastructure Ltd.

Length - 21.5 Kms

img

Detail Design for "Construction of Eight Lane Expressway from Rajasthan / MP Border to Jodmi village (design Ch. 0 to Ch. 32+000) section of Delhi - Vadodara in the State of Madhya Pradesh“

Client - MKC Infrastructure Ltd.

Length - 32 Kms

Project Cost - 888 Cr

img

Detail Design for "Construction of Eight Lane Expressway from Bani village to Bardawadi village (design Ch. from. Km. 65.0 to Km. 94.500) section of Delhi - Vadodara on EPC Mode in MP“

Client - MKC Infrastructure Ltd.

Length - 29.50 Kms

Project Cost - 880 Cr

Key Features - 8 Lane Expressway with Perpetual Flexible Pavement, 1 interchange, 4 VUP, 10 LVUP, 6 SVUP, 14 Minor Bridges & 71 Culverts   

img

Detail Design for “Four Laning of Dangiywas (km 96.5 of NH-112) to Jajiwal (km 283.5 of NH 65) section-Package-I (Design length 74.6 km) of Jodhpur Ring Road in Rajasthan” on Hybrid Annuity ".

Client - Mundan Construction / Gawar Construction

Length - 74.619 Kms

Project Cost - 1067 Cr

Key Features - 4 Lane Road with Rigid Pavement, 9 Flyovers, 2 RoBs, 1 Major Bridges, 1 VUP, 6 Minor Bridges & 121 Culverts    

img

Detail Design for Balance Work “Four Lanning of Warnga Mahagaon section of NH 361 from Km 253.700 to Km 320.580 in the state of Maharashtra on Hybrid Annuity Mode".

Client - Sadbhav Engineering Ltd.

Length - 46.495 Kms

Project Cost - 819 Cr

Key Features - 4 Lane Road with Rigid Pavement, 2 Major Bridges, 4 VUP, 6 LVUP, 8 PUP, 34 Minor Bridges & 86 Culverts

img

Detail Design for Balance Work of "Four Laning of Bhavnagar-Talaja Section of NH-8E from Km 7.090 to Km 53.585 (Design Chainage from Km 6.945 to Km 54.990) in Gujarat on Hybrid Annuity Mode under NHDP Phase IV“

Client - Sadbhav Engineering Ltd.

Length - 46.495 Kms

Project Cost - 819 Cr

Key Features - 4 Lane Road with Rigid Pavement, 1 Flyover, 2 Major Bridges, 14 VUP, 4 PUP, 27 Minor Bridges & 68 Culverts

img

Detail Design for Balance Work of "Four Laning of Una-Kodhinar Section of NH-8E from Km 180.478 to Km 221.610 (Design Chainage from Km 181.450 to Km 222.400) in Gujarat on Hybrid Annuity Mode under NHDP Phase IV".

Client - Sadbhav Engineering Ltd.

Length - 41.132 Kms

Project Cost - 623 Cr

Key Features - 4 Lane Road with Rigid Pavement, 1 RoB, 5 Major Bridges, 10 VUP, 2 PUP, 10 Minor Bridges & 52 Culverts  